Safety procedures
The goal at Kennecott Utah Copper Corporation (KUCC) is to achieve and maintain a zero accident environment. Workplace implementation of the Standards contained here is critical to achieving this goal. It is of utmost importance that each KUCC employee and contractor know, understand, and apply these standards.
Procedures are presented in Adobe® Acrobat® format.
To download Acrobat® Reader, click here.
HAZARD IDENTIFICATION AND RISK MANAGEMENT
5.5 Hazard Identification and Risk Managment
PERSONAL PROTECTIVE EQUIPMENT
9.1 Personal Protective Equipment
HEALTH AND ENVIRONMENTAL
10.6 Particulate and Gas/Vapor Exposures
10.7 Occupational Exposure Limits
10.8 Thermal Stress
10.9 Workplace Monitoring
GENERAL PROMOTION
12.1 Visitors' Policy
12.2 Non-KUC Rio Tinto Employees Working in KUC Facilities
MEDICAL AND HEALTH MANAGEMENT
13.2 Medical Surveillance
13.8 Fitness for Work
ENGINEERING AND PURCHASING CONTROLS
14.1 Contract of Service, Repair and Construction Work
14.5 General Freight/ Cargo Loading Operations
FACILITY STANDARDS
15.1 Electrical Safety
15.2 Lighting
15.3 Vehicles / Mobile Equipment
15.4 Restrooms, Changerooms, Lockers and Lunchrooms
15.5 Ladders Stairs and Walkways
15.6 Color Code Requirements
15.9 Stacking and Storage Practices
15.10 Ventilation
SAFETY STANDARDS
16.1 Hot Work Permit
16.2 Confined Space Entry Requirements
16.3 Restricted Access - Barricading / Off-Limit Entry
16.4 Cranes and Hoists
16.5 Aerial Lifts and Platforms
16.6 Slings
16.7 Scaffolds
16.8 Machine Guarding
16.9 Portable Electric Equipment
16.10 Electrical Grounding
16.12 Lockout / Tagout (Isolation)
16.13 Jumper Permit
16.14 Unfired Pressure Vessels
16.15 Compressed Gas
16.16 Hand Tools
16.17 Trenching and Excavation Requirements
16.18 Grinding Wheels
16.19 Temporary Heating Equipment
16.20 Fall Prevention
16.21 Ladders
16.22 Electric Transmission Lines
16.23 Welding Repairs and Modifications
16.24 Explosives Handling and Blasting
16.25 Fire Suppression Systems for Mobile Equipment
